Factory Wine Making Supplies Brewery Plant Alcohol Fermenting 5bbl Beer Brewing Equipment
Overview Product Description 300L 500L Stainless Steel Beer Brewery Equipment for Sale Hot Products Company Profile Our ;
Basic Info
Model NO. | MT-500L |
Condition | New |
Material | Full Stainless Steel SUS304 |
Welding | Arc Argon Protection |
After Sales Service | Installation and Equipment Commission |
Technology | Offer Auto CAD and 3D Design Drawing |
Material Thickness | Inner Wallet 3mm Outer Wallet 2mm |
Electric Elements | up to CE UL Standard |
Brewhouse Heating | Steam Jacket,Electric Tube,Direct Fire |
Voltage | 380V,220V |
Insulation | Polyurethane Foam |
Polish Finish | 0.4-0.6um |
Guarantee | 3 Years for Tank |
Transport Package | Plastic Film, Plywood Case; Container; |
Specification | Customized |
Trademark | METO |
Origin | Jinan China |
HS Code | 84384000 |
Production Capacity | 10 Set/Sets Per Month Stainless Steel Brewhouse |
Product Description
Product Description
300L 500L Stainless Steel Beer Brewery Equipment for Sale
2 Vessel Brewhouse | 3 Vessel Brewhouse |
Mash/Lauter tun+Brew kettle/whirlpool tank | 1.Lauter&storage tank+brew kettle/whirlpool tank 2.Lauter&whirlpool tank ,+brew kettle 3.Lauter&HLT +brewkettle/whirlpool tank |
Combined 3 Vessel Brewhouse | 4 Vessel Brewhouse |
1.Mash/lauter tun+ brew kettle +whirlpool tank 2.Mash tun+ lauter tank + brewkettle/whirlpool tank | Mash tun +lauter tank + brew kettle+whirlpool tank |
UNit | Components | Capacity | Specification |
Milling | Miller | 200KG/H | Double Roller,Noise<60db |
Brewhouse | Mash/Lauter tun | 500L | Mashing Process:Decoction.Infusion.Multi-step infusion |
Brew Kettle/Whirlpool Tank | 500L | Heating source:Steam,Electric,direct fire SUS304/Red copper | |
Hot Water Tank | 800L | Heating source:Steam,Electric,Gas | |
Heat exchanger | 5 SQM | Stainless steel plate | |
Fermentation tank | Fermentation Tank (The number according to customer requirements) | 500L or 1000L | Top manway/Side manway Drying hop port to brew IPA Dimple Plate Cooling jacket Carbonation port to fill CO2 |
Yeast Adding Tank | 5-10 L | SUS304 Stainless Steel | |
Cooling System | Glycol Water tank | 1500L | Equiped with PU level indicator |
Chiller | 5Hp | UL/CE certified electric elements,Copeland compressor | |
Pump | 3T/H | ||
Cleaning System | Disinfection Tank | 50-100L | SUS304 full welded |
Alkali Tank | 50-100L | ||
Pump | 3T/H | ||
Control System | Control Cabinet | PID or PLC | |
Optional | Auger System |
Packaging Details
1.LCL/FCL(20GP/40GP/40HQ).2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.3.Up to export standard, suitable for delivery.4.Customer's requirements available.
FAQOur service for you:
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and locate food, and hotel shall be afforded by the buyer3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,etc. should be installed separately. If needed, cost calculate additionally. 6. Brewing technology, brewing formula, can be offered available7. More spare parts are available to offered freely.
You may also like
Send inquiry
Send now